APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
2021. 组件完成组装后,用起重机吊起。

A、 After the assembly is installed, it is lifted by the car

B、 After the assembly is installed, it is lifted by the hoist

C、 After the assembly is installed, it is lifted by the handle

答案:B

设备系统操作理论翻译
2673. Do not exceed this speed with landing gear extended
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d0-9531-c0b8-ef8d402da900.html
点击查看题目
1345. Make sure the clamp is located together with the nut before it was removed
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-daba-c0b8-ef8d402da900.html
点击查看题目
2924. Prevent movement of the components when you repair the unit
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-e323-c0b8-ef8d402da900.html
点击查看题目
905. 飞行计划的最高商度将受到影响。
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b42-f68c-c0b8-ef8d402da900.html
点击查看题目
3302. Close valve A" when you get the same indications on gauges "X" AND "Y""
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e37-9e15-c0b8-ef8d402da900.html
点击查看题目
2478. Each system has a receiver which is located in an avionics compartment and which is tuned either automatically from the FMS or manually from the relevant NAV control panel
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-f151-c0b8-ef8d402da900.html
点击查看题目
302. Make sure that the two spigots at the bottom of the unit engage
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf7-1cfb-c0b8-ef8d402da900.html
点击查看题目
1278. The standby AC bus gets power from the left transfer bus, but changes to the static inverter when these are all true: left transfer bus does not have power; battery switch is on; standby power switch is in AUTO
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-085c-c0b8-ef8d402da900.html
点击查看题目
2760. The revision numbers and the date can be removed
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d1-a951-c0b8-ef8d402da900.html
点击查看题目
1771. Print all pages except wiring diagrams and foldouts on both sides
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67f-10cd-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

2021. 组件完成组装后,用起重机吊起。

A、 After the assembly is installed, it is lifted by the car

B、 After the assembly is installed, it is lifted by the hoist

C、 After the assembly is installed, it is lifted by the handle

答案:B

设备系统操作理论翻译
相关题目
2673. Do not exceed this speed with landing gear extended

A. 起落架收上时不要超过此速度

B. 起落架伸出时不要超过此速度

C. 起落架伸出时不要低于此速度

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d0-9531-c0b8-ef8d402da900.html
点击查看答案
1345. Make sure the clamp is located together with the nut before it was removed

A. The clamp should be in the same position with the nut.

B. The clamp should be at the same direction with the nut.

C. The clamp should have the same distance with the nut.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-daba-c0b8-ef8d402da900.html
点击查看答案
2924. Prevent movement of the components when you repair the unit

A. 防止部件移动以使能修理装置

B. 当你修理部件时要避免部件运动

C. 当你修理组件时应防止部件移动

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-e323-c0b8-ef8d402da900.html
点击查看答案
905. 飞行计划的最高商度将受到影响。

A. Maximum attitude for flight planning will be affected.

B. Maximum altitude for flight planning will be affected

C. Maximum attitude for flight planning will be affected.

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b42-f68c-c0b8-ef8d402da900.html
点击查看答案
3302. Close valve A" when you get the same indications on gauges "X" AND "Y""

A. Close valve A when the indications on gauges X and Y correctly.

B. Close valve A when you get the indications on gauges X and Y independently.

C. Close valve A when the indications on gauges X and Y correspond.

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e37-9e15-c0b8-ef8d402da900.html
点击查看答案
2478. Each system has a receiver which is located in an avionics compartment and which is tuned either automatically from the FMS or manually from the relevant NAV control panel

A. 每一个系统有一个接收器,这个接收器位于电子舱。电子舱内可以对FMS自动调谐,或是对相应的NAV控制面板手动调谐。

B. 每一个系统有一个接收器,这个接收器位于电子舱。接收器可以通过FMS自动调谐,或是通过相应的NAV控制面板手动调谐。

C. 每一个系统有一个电子舱接收器,接收器可以被FMS远程调谐,或是通过相应的NAV控制面板手动调谐。

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-f151-c0b8-ef8d402da900.html
点击查看答案
302. Make sure that the two spigots at the bottom of the unit engage

A. 确保装置底部两个接线板粘合

B. 确保装置底部两个接口结合

C. 确保装置顶部两个接线板粘合

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf7-1cfb-c0b8-ef8d402da900.html
点击查看答案
1278. The standby AC bus gets power from the left transfer bus, but changes to the static inverter when these are all true: left transfer bus does not have power; battery switch is on; standby power switch is in AUTO

A. 备用交流汇流条从左转换汇流条获得电源,但当如下情况发生任一条件时,变换到静变流机:左转换汇流条没有电:电瓶电门接通;备用电源电门在自动位。

B. 备用交流汇流条从左转换汇流条获得电源,但当如下情况都发生时,变换到静变流机:左转换汇流条没有电:电瓶电门接通;应急电源电门在自动位。

C. 备用交流汇流条从左转换汇流条获得电源,但当如下情况都发生时,变换到静变流机:左转换汇流条没有电:电瓶电门接通;备用电源电门在自动位。

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-085c-c0b8-ef8d402da900.html
点击查看答案
2760. The revision numbers and the date can be removed

A. 版本数量和日期可以删除。

B. 版本号和日期可以删除。

C. 版本次数和日期可以删除。

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d1-a951-c0b8-ef8d402da900.html
点击查看答案
1771. Print all pages except wiring diagrams and foldouts on both sides

A. 双面打印除线路图和折页外的所有页。

B. 双面打印除线路图外的所有折页。

C. 除了折叠的线路图外,双面打印所有页面。

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67f-10cd-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载