APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
2036. You can replace a large number of units during engine installation

A、 你需要在安装发动机时更换大量零件。

B、 更换发动机时,你可以安装大量部件。

C、 在发动机安装时可能更换大量部件。

答案:C

设备系统操作理论翻译
3229. The removal/installation portion shall state clearly the sequence of steps required to remove and reinstall a component or unit, along with precautions to be observed
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-adf4-c0b8-ef8d402da900.html
点击查看题目
2506. 确保没有沿翼展移动的迹象。
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69ce-4c3d-c0b8-ef8d402da900.html
点击查看题目
2027. 估计所需的清洗液量。
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44b9-e756-c0b8-ef8d402da900.html
点击查看题目
1636. 如果是由于下游阻塞造成压力上升太多,释放活门就会打开。
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67d-5f11-c0b8-ef8d402da900.html
点击查看题目
1465. Before you do this procedure, engage the ramp service door safety connector pin
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d7-b405-c0b8-ef8d402da900.html
点击查看题目
1209. 固定卡子必须迅速移动到位。
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-2ab6-c0b8-ef8d402da900.html
点击查看题目
2811. Install the safety devices
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d2-4a20-c0b8-ef8d402da900.html
点击查看题目
3001. Lock the pulley with the rigging pin
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e33-c564-c0b8-ef8d402da900.html
点击查看题目
1280. 确保孔的直径小于规定值。
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-0ecd-c0b8-ef8d402da900.html
点击查看题目
943. This procedure includes the instructions to remove the constant speed drive( )
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b43-936d-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

2036. You can replace a large number of units during engine installation

A、 你需要在安装发动机时更换大量零件。

B、 更换发动机时,你可以安装大量部件。

C、 在发动机安装时可能更换大量部件。

答案:C

设备系统操作理论翻译
相关题目
3229. The removal/installation portion shall state clearly the sequence of steps required to remove and reinstall a component or unit, along with precautions to be observed

A. 拆卸/安装部分应清晰的说明拆卸和安装部件或单元所需的步骤顺序,以及要遵守的预防措施

B. 拆卸/安装部分应清晰的说明拆卸和重新安装部件或测试所需的步骤顺序,以及要遵守的预防措施

C. 拆卸/安装部分应清晰的说明拆卸和重新安装部件或单元所需的步骤顺序,以及要遵守的预防措施

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-adf4-c0b8-ef8d402da900.html
点击查看答案
2506. 确保没有沿翼展移动的迹象。

A. Make sure that there are no indications of movement along the span.

B. Make sure that there are no signs of movement along the span.

C. Make sure that there are no indications of movement along the airframe.

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69ce-4c3d-c0b8-ef8d402da900.html
点击查看答案
2027. 估计所需的清洗液量。

A. Evaporate the amount of cleaning fluid that is necessary;

B. Evaluate the amount of cleaning fluid that is necessary;

C. Estimate the amount of cleaning fluid that is necessary;

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44b9-e756-c0b8-ef8d402da900.html
点击查看答案
1636. 如果是由于下游阻塞造成压力上升太多,释放活门就会打开。

A. If the pressure increases too much because of a downstream blockage, the relief valve opens.

B. If the pressure decreases too much because of a downstream broken, the relief valve opens.

C. If the pressure increases too much because of a upstream leak, the relief valve opens.

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67d-5f11-c0b8-ef8d402da900.html
点击查看答案
1465. Before you do this procedure, engage the ramp service door safety connector pin

A. Insert the pin of the apron service door security connector, then you can perform this procedure.

B. The ramp service door safety pin should be engaged until you start this procedure.

C. Firstly you should perform this procedure then you can engage the ramp service door safety connector pin.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d7-b405-c0b8-ef8d402da900.html
点击查看答案
1209. 固定卡子必须迅速移动到位。

A. The retaining clip must move quickly into position.

B. The retaining clip should move quickly into position.

C. The retaining clip should move quickly look.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-2ab6-c0b8-ef8d402da900.html
点击查看答案
2811. Install the safety devices

A. 维护安全组件

B. 安装安全装置

C. 拆卸安全部件

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d2-4a20-c0b8-ef8d402da900.html
点击查看答案
3001. Lock the pulley with the rigging pin

A. Use the rigging pin to lock the pulley.

B. Use the pulley to lock the rigging pin.

C. The rigging pin should be locked by the pulley.

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e33-c564-c0b8-ef8d402da900.html
点击查看答案
1280. 确保孔的直径小于规定值。

A. Make sure that the diameter of the hole is less than the specified value.

B. Make sure that the diameter of the hole is more than the specified value.

C. Make sure that the radius of the opening is less than the specified value.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-0ecd-c0b8-ef8d402da900.html
点击查看答案
943. This procedure includes the instructions to remove the constant speed drive( )

A. 这个程序包括拆卸恒速驱动装置(CSD)的说明。

B. 此程序包括删除恒速驱动装置(CSD)的指令。

C. 这个程序包括指令来去除恒速驱动装置(CSD)。

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b43-936d-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载