APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
2648. 打开控制活门(13)和(20),并操作手摇泵(17)以排空加注系统。

A、 Open the control valve (13), close the control valve (20) and manually operate the oil pump(17) to empty the system.

B、 Open the control valves (13) and(20) and operate the hand pump(17) to bleed the filling system.

C、 Open the control valves (13) and(20) and manually operate the air inlet pump (17) for filling.

答案:B

设备系统操作理论翻译
2788. Nomenclature shall be consistent throughout all technical data provided to the Customer
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d1-ff19-c0b8-ef8d402da900.html
点击查看题目
250. GET ( ) TO THE ACCUMULATOR FOR THE No 1 HYDRAULIC SYSTEM
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf6-70a5-c0b8-ef8d402da900.html
点击查看题目
3352. Floor beam at body station 360 has moderate corrosion 2 inches in length and 1 inch in diameter
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e38-3531-c0b8-ef8d402da900.html
点击查看题目
1719. Step 2 is applicable only if the weather is wet
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67e-682b-c0b8-ef8d402da900.html
点击查看题目
530. Instead of using the actual date of issue on each page of an original issue of a Document, the words “original issue” may be used In such a case, the Title Page and the Table of Contents pages preceding each section of the Document must bear the actual date of issue following the words “original issue”
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b3e-2a75-c0b8-ef8d402da900.html
点击查看题目
688. Examine the area that is around the drain holes for signs of corrosion
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b40-5385-c0b8-ef8d402da900.html
点击查看题目
2914. When there are several words in English for the same thing ( ),STE permits one of these synonyms to the exclusion of the others
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-c11f-c0b8-ef8d402da900.html
点击查看题目
153. If you push the LSK that is adjacent to EXIT, then the BITE will take you out of BITE test and put the airplane back to its usual condition
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-1342-c0b8-ef8d402da900.html
点击查看题目
2504. Unit or assembly removal/installation procedures may reference a system/subsystem test only if the major test procedure is so utilized that the individual assembly/unit test may be called out without overlap and if accomplishment shall not require completion of the whole system test
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69ce-45f2-c0b8-ef8d402da900.html
点击查看题目
2475. The Listing of CAP Inspections contains all Continuing Airworthiness Program Inspections in the CAP, in numerical order by CAP inspection number, with full title, date, effectivity and inspection compliance
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-e7b0-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

2648. 打开控制活门(13)和(20),并操作手摇泵(17)以排空加注系统。

A、 Open the control valve (13), close the control valve (20) and manually operate the oil pump(17) to empty the system.

B、 Open the control valves (13) and(20) and operate the hand pump(17) to bleed the filling system.

C、 Open the control valves (13) and(20) and manually operate the air inlet pump (17) for filling.

答案:B

设备系统操作理论翻译
相关题目
2788. Nomenclature shall be consistent throughout all technical data provided to the Customer

A. 所有提供给客户的技术文件中的术语应保持一致;

B. 所有提供给客户的技术文件中的单位应保持一致;

C. 所有的术语都应该包含在提供给客户的技术文件中;

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d1-ff19-c0b8-ef8d402da900.html
点击查看答案
250. GET ( ) TO THE ACCUMULATOR FOR THE No 1 HYDRAULIC SYSTEM

A. ACCESS

B. NEAR

C. CLOSE

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf6-70a5-c0b8-ef8d402da900.html
点击查看答案
3352. Floor beam at body station 360 has moderate corrosion 2 inches in length and 1 inch in diameter

A. 机身站位360处的地板梁有低度腐蚀(长2英寸,直径1英寸)。

B. 机身站位360处的地板梁有重度腐蚀(长2英寸,半径1英寸)。

C. 机身站位360处的地板梁有中度腐蚀(长2英寸,直径1英寸)。

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e38-3531-c0b8-ef8d402da900.html
点击查看答案
1719. Step 2 is applicable only if the weather is wet

A. 步骤2只适用于潮湿的情况。

B. 步骤2只适用于潮湿的布。

C. 步骤2只适用于潮湿的天气。

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67e-682b-c0b8-ef8d402da900.html
点击查看答案
530. Instead of using the actual date of issue on each page of an original issue of a Document, the words “original issue” may be used In such a case, the Title Page and the Table of Contents pages preceding each section of the Document must bear the actual date of issue following the words “original issue”

A. On each page of an original document, the words “original issue”, rather than the actual date of issue, may be used. Used the title page and the table of contents page before each section of the file must be marked with the actual release date after the “original release”.

B. On each page of an original documents, the words “original issue” may be used. The actual release date is in the file and must be standard on the title page and the table of contents page before each section.

C. The actual issue date should be marked on each page of the original document An alternative might be to use the term “original issue” instead. To do so, the title page of the document and the table of contents page at the beginning of each chapter must be marked “original publication”.

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b3e-2a75-c0b8-ef8d402da900.html
点击查看答案
688. Examine the area that is around the drain holes for signs of corrosion

A. Perform check to see if there are traces of corrosion around the drain holes.

B. Check the drain holes for signs of corrosion.

C. Check the area surrounding the drain holes for signs of contamination.

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b40-5385-c0b8-ef8d402da900.html
点击查看答案
2914. When there are several words in English for the same thing ( ),STE permits one of these synonyms to the exclusion of the others

A. STE uses one of these acronyms including others when there are different words in English for the same thing(acronyms).

B. When there are different words in English for the same thing (synonyms), STE allows one synonym rather than others.

C. It is allowable in STE to use one of these abbreviations when several words can express the same thing(abbreviations).

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-c11f-c0b8-ef8d402da900.html
点击查看答案
153. If you push the LSK that is adjacent to EXIT, then the BITE will take you out of BITE test and put the airplane back to its usual condition

A. After pressing the LSK next to EXIT the BITE will take you out of BITE test and the airplane win return to its normal condition

B. The BITE will continue the BITE test and the airplane will go back to its usual condition when you push the LSK next to EXIT

C. The BITE will proceed the BITE teste and the airplane will go back to, its normal configuration after releasing the LSK that is adjacent to EXIT

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-1342-c0b8-ef8d402da900.html
点击查看答案
2504. Unit or assembly removal/installation procedures may reference a system/subsystem test only if the major test procedure is so utilized that the individual assembly/unit test may be called out without overlap and if accomplishment shall not require completion of the whole system test

A. 如果只能用可能导致单个组件/单元没有超出预测的重大检测程序,而且完成不需要完全的检测,装置或组件移除/组装程序可查阅系统/子系统检测。

B. 如果重大测验程序使用独立的模块/单元来呼叫没有超出范围的部分,且完成不需要整个系统进行测验,单元或模块移除/安装程序只可以按照系统/子系统测验来做。

C. 只有在使用主要测试程序而单个组件/装置测试不重复进行,且完成该过程不要求完成整个系统的测试时,装置或组件的拆/装程序才可参考系统/子系统的测试。

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69ce-45f2-c0b8-ef8d402da900.html
点击查看答案
2475. The Listing of CAP Inspections contains all Continuing Airworthiness Program Inspections in the CAP, in numerical order by CAP inspection number, with full title, date, effectivity and inspection compliance

A. In the Listing of CAP Inspections, apart from full title, date, effectivity and inspection compliance, all Continuing Airworthiness Program Inspections in the CAP are exclude in numerical order on the basis of CAP inspection number.

B. Along with full title, date, effectivity and inspection compliance, all Continuing Airworthiness Program Inspections in the CAP are exclude in numerical order in the light of CAP inspection number, in the Listing of CAP Inspections.

C. All Continuing Airworthiness Program Inspections in the CAP are covered, in numerical order, in the Listing of CAP Inspections along with full title, date, effectivity and inspection compliance

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-e7b0-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载