A、 Replace broken clamp with new clamp with reference to standard practices and AMM and relieve rubbing with the bundle at floor bar cut at body station 360.
B、 Replaced broken clamp with a new clamp diminishing rubbing at floor beam cutout at body station 360 with reference to standard practices and AMM.
C、 According to the standard practices and AMM, the damaged clamp at the body station360 was replaced to eliminate the friction between the wire bundle and the cutout of the floor beam at this place.
答案:C
A、 Replace broken clamp with new clamp with reference to standard practices and AMM and relieve rubbing with the bundle at floor bar cut at body station 360.
B、 Replaced broken clamp with a new clamp diminishing rubbing at floor beam cutout at body station 360 with reference to standard practices and AMM.
C、 According to the standard practices and AMM, the damaged clamp at the body station360 was replaced to eliminate the friction between the wire bundle and the cutout of the floor beam at this place.
答案:C
A. complex sentence structure and the large number of meanings and antonym that many English words have can cause confusion
B. complex sentence structure and the large number of meanings and synonyms that many English words have can cause confusion
C. complex sentence structure and the large number of meanings and diverse that many English words have can cause confusion
A. Attach the aft cargo compartment forward bulkhead central panel.
B. Mount the front cargo compartment backward bulkhead center panel.
C. Fix the aft bulkhead forward panel to the forward cargo component.
D.
E.
F.
G.
H.
I.
J.
解析:A. 绑定后货舱前舱壁中央面板(Attach the aft cargo compartment forward bulkhead central panel):这个选项描述的是将后货舱的前舱壁中央面板安装到相反的位置,与题干提到的安装过程不符,因此不是正确答案。
B. 安装前货舱向后舱壁靠的中央面板(Mount the front cargo compartment backward bulkhead center panel):这个选项描述的是将前货舱的向后的舱壁中央面板安装到相反的位置,与题干提到的安装过程也不符,因此不是正确答案。
C. 将后舱壁前面板固定到前货舱(Fix the aft bulkhead forward panel to the forward cargo component):这个选项正确地描述了安装过程,即将后舱壁的前面板固定到前货舱的组件上。
因此,可以得出正确答案为选项C:将后舱壁前面板固定到前货舱。
综上所述,正确答案为选项C:Fix the aft bulkhead forward panel to the forward cargo component.
A. 乙醇是非常易燃的。
B. 乙醚是非常易燃的。
C. 甲苯是非常易燃的。
A. Remove the middle bell crank unit.
B. Remove the moderate dual crank unit.
C. Remove the middle double crank unit.
A. 没有保护,材料会造成表面腐蚀
B. 材料没有保护的表面会被腐蚀
C. 材料会腐蚀没有保护的表面
A. 如果跳开关拔出,则断开电路
B. 如果跳开关闭合,则断开电路
C. 如果跳开关拔出,测接通电路
A. 在外表面上涂抹密到胶。
B. 在外壁板施加载荷。
C. 在外壳上喷除防锈剂。
A. 用螺丝刀松动夹子。
B. 用扳手松动夹子。
C. 用螺丝刀拧紧夹子。
A. 从油箱内排放约2升滑油。
B. 从油箱内排放约2升液压油。
C. 从油箱内排放约2升燃油。
A. Staff must violate this procedure.
B. All persons must follow this procedure.
C. Personnel must deviate from this procedure.