A、 In the maintenance manual, this section shall cover subjects such as power plant buildup, teardown, etc.
B、 In the overhaul manual, this section shall cover subjects such as power plant buildup, teardown, etc.
C、 In the overhaul manual, this section have to cover subjects such as power plant buildup, teardown, etc.
答案:B
A、 In the maintenance manual, this section shall cover subjects such as power plant buildup, teardown, etc.
B、 In the overhaul manual, this section shall cover subjects such as power plant buildup, teardown, etc.
C、 In the overhaul manual, this section have to cover subjects such as power plant buildup, teardown, etc.
答案:B
A. 确保开关上安装了防护。
B. 确保开关上安装了保险。
C. 确保电门上有了保险。
A. The shim is t, which is thick by calculating x and y.
B. Calculate the shim, the result of the thickness is x-y.
C. The thickness of the shim is thus calculated: t=x-y.
A. Move the slat control lever to a unit position
B. Move the flap control lever to the 1 unit position
C. Move the flaperon control lever to the 1 unit position
A. Includes items such as nose ring cowls, scoops, compressor fan cowls, buried engine ducts, vortex generators, actuators, control handles, cables, plumbing, linkages, doors, warning systems, position indicators, etc.
B. Includes i terns such as nose ring cowls, scoops, compressor, buried engine ducts, vortex generators, actuators, control handles, cables, plumbing, linkages, doors, waring systems, position indicators, etc.
C. Includes items such as nose ring cowls, scoops, compressor fan cowls, buried engine ducts, vortex generators, actuators, control handles, cables, plumbing, linkages, doors, warning systems, position indicators.
A. INNER
B. OUTPUT
C. INPUT
A. 缓慢增加压力(每分钟不少于过一圈)
B. 缓慢释放压力(每分钟不超过一圈)
C. 缓慢增加压力(每分钟不超过一圈)
A. 确保标签完全贴平
B. 确保锁扣完全扣好
C. 确保机构完全连接
A. 对所有维修过的产品进行全面检查。
B. 对所有维修过的产品进行仔细检查。
C. 对所有维修过的产品进行初始检查。
A. 本节中包含的异常应由手册编写者确定。
B. 手册的起草者可以将异常情况编入此章节
C. 手册的生产商可以根据异常情况决定是否将其编入此章节。
A. 包含“备份程序”的部分应该用一个红色金属的标签分隔。
B. 包含“应急程序”的部分应该用一个红色塑化的标签分隔。
C. 包含“应急程序”的部分应该用一个红色金属的标签分隔。