APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
2693. If the fault occurs regularly, do the troubleshooting of the system

A、 如果故障频繁发生,进行系统排故

B、 如果故障定期发生,进行系统排故

C、 如果故障偶尔发生,进行系统排故

答案:B

设备系统操作理论翻译
1881. An incorrect connection will cause damage
https://www.shititong.cn/cha-kan/shiti/0009ffad-f680-71d3-c0b8-ef8d402da900.html
点击查看题目
1219. The purpose of such terms is to provide definitions which are of practical value for technical communication
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-4a4f-c0b8-ef8d402da900.html
点击查看题目
3089. 将其中一个空调组件电门置于“高流量”位。
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e34-fcd9-c0b8-ef8d402da900.html
点击查看题目
2799. 你无需给飞机泄油便可拆掉作动器。
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d2-23c4-c0b8-ef8d402da900.html
点击查看题目
1771. Print all pages except wiring diagrams and foldouts on both sides
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67f-10cd-c0b8-ef8d402da900.html
点击查看题目
124. Blind rivet is a special rivet used in a sheet metal structure that can be installed when there is access to only one side of the metal
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-b893-c0b8-ef8d402da900.html
点击查看题目
3209. For case of reference, these dividers shall be staggered
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-729c-c0b8-ef8d402da900.html
点击查看题目
1697. In some cases, the Specification is used to prepare for Continuing Airworthiness Program for acceptance by another airworthiness authority other than FAA
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67e-217d-c0b8-ef8d402da900.html
点击查看题目
2841. Apply talcum powder to the area
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d2-a614-c0b8-ef8d402da900.html
点击查看题目
373. If the RAT is retracted, slowly and fully extend the RAT and make sure that it does not touch other parts
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf7-ffb4-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

2693. If the fault occurs regularly, do the troubleshooting of the system

A、 如果故障频繁发生,进行系统排故

B、 如果故障定期发生,进行系统排故

C、 如果故障偶尔发生,进行系统排故

答案:B

设备系统操作理论翻译
相关题目
1881. An incorrect connection will cause damage

A. 错误的连接会造成损伤

B. 松散的接头会造成损伤

C. 损伤的原因是松散的连接

https://www.shititong.cn/cha-kan/shiti/0009ffad-f680-71d3-c0b8-ef8d402da900.html
点击查看答案
1219. The purpose of such terms is to provide definitions which are of practical value for technical communication

A. The intention of such terms is to provide definitions which have practical value for technical communication.

B. The propose of such terms is to provide definitions with practical value for technical communication.

C. The aim of such terms is to provide definitions for practicing valuable technical communication.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-4a4f-c0b8-ef8d402da900.html
点击查看答案
3089. 将其中一个空调组件电门置于“高流量”位。

A. Set the air conditioning switch to the up position.

B. Place an air conditioning switch above the normal position.

C. Put one of the pack switches in the HIGH position

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e34-fcd9-c0b8-ef8d402da900.html
点击查看答案
2799. 你无需给飞机泄油便可拆掉作动器。

A. You can install the actuator without defueling the airplane.

B. You can remove the actuator and refuel the airplane.

C. You can remove the actuator without defueling the airplane.

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d2-23c4-c0b8-ef8d402da900.html
点击查看答案
1771. Print all pages except wiring diagrams and foldouts on both sides

A. 双面打印除线路图和折页外的所有页。

B. 双面打印除线路图外的所有折页。

C. 除了折叠的线路图外,双面打印所有页面。

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67f-10cd-c0b8-ef8d402da900.html
点击查看答案
124. Blind rivet is a special rivet used in a sheet metal structure that can be installed when there is access to only one side of the metal

A. Blind rivet is a special rivet used in a sheet metal structure that can be installed when either side of the metal can get access to.

B. Blind rivet is a special rivet used in a sheet metal structure that can be installed when neither side of the metal can get access to.

C. Blind rivet is used in a sheet metal structure because there is not enough space to both sides of the metal.

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-b893-c0b8-ef8d402da900.html
点击查看答案
3209. For case of reference, these dividers shall be staggered

A. 为了参考使用,标签分隔符应该按顺序排列。

B. 交错使用制表分隔符将有助于参考。

C. 为了便于参考,隔页签应交错排列。

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-729c-c0b8-ef8d402da900.html
点击查看答案
1697. In some cases, the Specification is used to prepare for Continuing Airworthiness Program for acceptance by another airworthiness authority other than FAA

A. Both FAA and other authority may accept the Specification

B. Other authority may accept the Specification, but not FAA

C. FAA or other authority may accept the Speification

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67e-217d-c0b8-ef8d402da900.html
点击查看答案
2841. Apply talcum powder to the area

A. 用滑石粉处理该区域。

B. 在该区域涂抹滑石粉。

C. 撒滑石粉在该区域。

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d2-a614-c0b8-ef8d402da900.html
点击查看答案
373. If the RAT is retracted, slowly and fully extend the RAT and make sure that it does not touch other parts

A. 如果RAT被撤回,缓慢并完全将其伸出,确保与其他部件衔接上。

B. 如果追踪到RAT,则缓慢并完全释放RAT确保信号不与其他混淆。

C. 如果RAT是收回状态,缓慢和完全展开RAT,并确保它不碰到其他部件。

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf7-ffb4-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载