APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
2756. 计算的纬度错误经常会发生在一个ADIRU内。如果位置误差是在一个ADIRU内,开始新的校准。如果新的校准仍有位置误差,参阅维护手册第二部分的故障查询程序。

A、 A calculated latitude error usually will occur in one ADIRU. If the position difference is in one ADIRU, start a new alignment . If the new alignment has a position difference, refer to troubleshooting procedures in part two of the maintenance manual.

B、 A calculated longitude error usually will occur in one ADIRU. If the position difference is in one ADIRU, restart a new alignment if the new alignment has a position difference, refer to troubleshooting procedures in part two of the maintenance manual.

C、 A calculated longitude error usually will occur in one ADIRU if the position difference is in one ADIRU, start anew alignment. If the new alignment has a position difference refer to troubleshooting procedures in part two of the maintenance manual.

答案:A

设备系统操作理论翻译
2033. 飞机内部连接外部电源和飞机电气系统的系统。
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44b9-fb5d-c0b8-ef8d402da900.html
点击查看题目
3160. When autopilot is disengaged, there is aural warning from aural warning module and the A/P red flashing warning light on the ASAs
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-daf5-c0b8-ef8d402da900.html
点击查看题目
3152. The windshield outlets are forward of the captain and first officer glareshield
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-c1c9-c0b8-ef8d402da900.html
点击查看题目
1574. 对于机翼/机身过热系统的指示和测试,必须要接通115V交流电源。当安装元件时,不得弯曲元件直到弯曲半径小于1英寸。如果弯曲半径小于1英寸,则会损坏元件。
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67c-9387-c0b8-ef8d402da900.html
点击查看题目
766. The system to be tested operated abnormally during last flight leg
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b41-49dc-c0b8-ef8d402da900.html
点击查看题目
2024. The letters will be matt black on white
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44b9-dcf5-c0b8-ef8d402da900.html
点击查看题目
2152. 在尽可能的情况下示例,相关条件和技术的说明应与图表显示在同一页上,如果页面空间放不下必要的信息则应使用面向图表的另一页面
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bb-b614-c0b8-ef8d402da900.html
点击查看题目
734. THIS TEST ( ) THE INSTALLATION OF THE HP PUMP
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b40-e42e-c0b8-ef8d402da900.html
点击查看题目
911. Maintenance Practices which are a combination of servicing, removal/installation, adjustment/test, inspection/check, cleaning/painting, and approved repairs should follow the Troubleshooting Section
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b43-2d55-c0b8-ef8d402da900.html
点击查看题目
124. Blind rivet is a special rivet used in a sheet metal structure that can be installed when there is access to only one side of the metal
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-b893-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

2756. 计算的纬度错误经常会发生在一个ADIRU内。如果位置误差是在一个ADIRU内,开始新的校准。如果新的校准仍有位置误差,参阅维护手册第二部分的故障查询程序。

A、 A calculated latitude error usually will occur in one ADIRU. If the position difference is in one ADIRU, start a new alignment . If the new alignment has a position difference, refer to troubleshooting procedures in part two of the maintenance manual.

B、 A calculated longitude error usually will occur in one ADIRU. If the position difference is in one ADIRU, restart a new alignment if the new alignment has a position difference, refer to troubleshooting procedures in part two of the maintenance manual.

C、 A calculated longitude error usually will occur in one ADIRU if the position difference is in one ADIRU, start anew alignment. If the new alignment has a position difference refer to troubleshooting procedures in part two of the maintenance manual.

答案:A

设备系统操作理论翻译
相关题目
2033. 飞机内部连接外部电源和飞机电气系统的系统。

A. That portion of the system within the aircraft which connects external electrical power to the aircraft's electrical system.

B. That portion of the system within the aircraft which connects service electrical power to the aircraft's electrical system.

C. That portion of the system within the aircraft which connects integral electrical power to the aircraft's electrical system.

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44b9-fb5d-c0b8-ef8d402da900.html
点击查看答案
3160. When autopilot is disengaged, there is aural warning from aural warning module and the A/P red flashing warning light on the ASAs

A. When autopilot is disconnected, it also turns off the A/P red flashing warning light on the ASAs.

B. The driving is disconnected, the warning module issues an alarm and the A/P light flashes at the same time.

C. When autopilot is disconnected, the warning module issues an alarm and the A/P light flashes.

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-daf5-c0b8-ef8d402da900.html
点击查看答案
3152. The windshield outlets are forward of the captain and first officer glareshield

A. 风挡出口是在机长和副驾的挡风口前面

B. 风挡出口是在机长和副驾遮光板的前面

C. 风挡出口是在机长和副驾操作板的前面

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-c1c9-c0b8-ef8d402da900.html
点击查看答案
1574. 对于机翼/机身过热系统的指示和测试,必须要接通115V交流电源。当安装元件时,不得弯曲元件直到弯曲半径小于1英寸。如果弯曲半径小于1英寸,则会损坏元件。

A. To give indications and test to the wing/body overheat system, 115v ac power must be connected. When installing an element, do not bend the element unless the bend radius is less than one inch. If the bend radius is less than one inch, damage to the element can occur.

B. For the indications and test of the wing/body overheat system, 115v ac power must be ON. When you install an element,do not bend the element until the bend radius is less than one inch. If the bend radius is less than one inch, damage to the element can occur.

C. 115v dc power must be supplied for the indications and test of the wing/body overheat system. When you install an element, do not bend the element radius less than one inch. If you bend the radius less than one inch, damage to the element can occur.

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67c-9387-c0b8-ef8d402da900.html
点击查看答案
766. The system to be tested operated abnormally during last flight leg

A. 将要测试的这个系统在上个航段运转不正常。

B. 该系统要测试上一航段的不正常运行。

C. 在上一航段里该系统被测试为运行不正常。

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b41-49dc-c0b8-ef8d402da900.html
点击查看答案
2024. The letters will be matt black on white

A. 信函是白纸黑字印刷的。

B. 字母是白色背景下哑光黑色的。

C. 书信需要黑白复印件。

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44b9-dcf5-c0b8-ef8d402da900.html
点击查看答案
2152. 在尽可能的情况下示例,相关条件和技术的说明应与图表显示在同一页上,如果页面空间放不下必要的信息则应使用面向图表的另一页面

A. It is possible to use the same page to include the examples, associated conditions and technique. Should there be no necessary information included, refer to the page facing the chart.

B. If the same page contains examples, associated conditions and techniques, you need to include all the necessary information, it is forbidden to use the page that the figure faces.

C. Where possible, examples, associated conditions and technique should be presented on the same page as the chart. If space is not enough to include the necessary information, then the page facing the chart should be used.

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bb-b614-c0b8-ef8d402da900.html
点击查看答案
734. THIS TEST ( ) THE INSTALLATION OF THE HP PUMP

A. FOLLOWS

B. FOLLOWING

C. FOLLOWED

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b40-e42e-c0b8-ef8d402da900.html
点击查看答案
911. Maintenance Practices which are a combination of servicing, removal/installation, adjustment/test, inspection/check, cleaning/painting, and approved repairs should follow the Troubleshooting Section

A. Maintenances Practices include servicing, removal/installation, adjustment/test, inspection/check, cleaning/painting. And approved repairs Maintenance Practices" should obey the instructions of the Troubleshooting Section."

B. Maintenance Practices include servicing, removal/installation, adjustment/test, inspection/check, cleaning/painting, and approved repairs Maintenance Practices" should be located after the Troubleshooting Section."

C. Maintenances Practices include servicing, removal/installation, adjustment/test, inspection/check cleaning/painting. Approved repairs should be located after the Troubleshooting Section.

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b43-2d55-c0b8-ef8d402da900.html
点击查看答案
124. Blind rivet is a special rivet used in a sheet metal structure that can be installed when there is access to only one side of the metal

A. Blind rivet is a special rivet used in a sheet metal structure that can be installed when either side of the metal can get access to.

B. Blind rivet is a special rivet used in a sheet metal structure that can be installed when neither side of the metal can get access to.

C. Blind rivet is used in a sheet metal structure because there is not enough space to both sides of the metal.

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-b893-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载