APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
2758. The design authority must give approval to changes that you make to the repair scheme

A、 The design authority must approve any amendments you make to the repair scheme.

B、 The design authority must approve any supports you make to the repair scheme.

C、 The design authority must approve any amendments you make to the maintenance plan.

答案:A

设备系统操作理论翻译
3209. For case of reference, these dividers shall be staggered
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-729c-c0b8-ef8d402da900.html
点击查看题目
1573. The equipment cooling system has low flow detectors to give a warning when there is not sufficient cooling airflow On the ground, the crew call horn sounds when low flow is detected in the supply system
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67c-9056-c0b8-ef8d402da900.html
点击查看题目
164. This system does not supersede the normal channels of communication for items not covered by the CAP
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-3745-c0b8-ef8d402da900.html
点击查看题目
1992. A pitch enhancement system,power transfer unit( ) between the left and right systems, supplies a third source of power for the horizontal stabilizer
https://www.shititong.cn/cha-kan/shiti/0009ffad-f682-0275-c0b8-ef8d402da900.html
点击查看题目
3310. Make sure that you do not cut the control cable
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e37-b66a-c0b8-ef8d402da900.html
点击查看题目
2345. 根据43部法规持证的飞行员有权利执行有限的预防性维修
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44be-4821-c0b8-ef8d402da900.html
点击查看题目
2019. If you cannot push a needle or equivalent through the inspection hole, then rod eye is deep enough
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44b9-cbd5-c0b8-ef8d402da900.html
点击查看题目
2186. Before you do servicing of the hydraulic system, isolate it
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bc-265f-c0b8-ef8d402da900.html
点击查看题目
875. 通过次要的汇流条为其他系统,包括发电机、继电器、逆变器、电瓶等产生、控制和提供交流电和/或自流电的电源组件和部件。
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b42-9dc3-c0b8-ef8d402da900.html
点击查看题目
2152. 在尽可能的情况下示例,相关条件和技术的说明应与图表显示在同一页上,如果页面空间放不下必要的信息则应使用面向图表的另一页面
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bb-b614-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

2758. The design authority must give approval to changes that you make to the repair scheme

A、 The design authority must approve any amendments you make to the repair scheme.

B、 The design authority must approve any supports you make to the repair scheme.

C、 The design authority must approve any amendments you make to the maintenance plan.

答案:A

设备系统操作理论翻译
相关题目
3209. For case of reference, these dividers shall be staggered

A. 为了参考使用,标签分隔符应该按顺序排列。

B. 交错使用制表分隔符将有助于参考。

C. 为了便于参考,隔页签应交错排列。

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-729c-c0b8-ef8d402da900.html
点击查看答案
1573. The equipment cooling system has low flow detectors to give a warning when there is not sufficient cooling airflow On the ground, the crew call horn sounds when low flow is detected in the supply system

A. 设备冷却系统的低流量传感器给出警告,没有足够冷气。飞机在地面时,当出现供气系统低流量时,机组打电话报告警报声。

B. 没有冷却气流供应时,设备冷却系统有低流量探测器来发出警告。在地面上,当供气系统检测到低流量时,机组人员会发出呼号警报。

C. 冷却气流不足时,设备冷却系统低流量探测器发出警告。当飞机在地面时,如果供气系统中探测到低流量,机组人员呼叫喇叭响起。

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67c-9056-c0b8-ef8d402da900.html
点击查看答案
164. This system does not supersede the normal channels of communication for items not covered by the CAP

A. 本制度不会取代CAP中未包括事项的常规沟通渠道。

B. 本系统无法超越CAP涵盖的常规沟通渠道

C. 未包括在CAP中的常规沟通渠道不能代替本制度。

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-3745-c0b8-ef8d402da900.html
点击查看答案
1992. A pitch enhancement system,power transfer unit( ) between the left and right systems, supplies a third source of power for the horizontal stabilizer

A. 一套俯仰保持系统,在左右液压系统之间的动力转换组件,将提供给水平安定面第三种动力源。

B. 一套俯仰增强系统,在左右液压系统之间的动力转换组件,将提供给水平安定面第三种动力源。

C. 一套俯仰增强系统,在左右液压系统之间的动力转换组件,将提供给升降舵第三种动力源。

https://www.shititong.cn/cha-kan/shiti/0009ffad-f682-0275-c0b8-ef8d402da900.html
点击查看答案
3310. Make sure that you do not cut the control cable

A. 确保没有剪断操纵钢索。

B. 确保没有关断控制电源。

C. 确保没有连接控制电缆。

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e37-b66a-c0b8-ef8d402da900.html
点击查看答案
2345. 根据43部法规持证的飞行员有权利执行有限的预防性维修

A. A pilot with certification authorized by Part 43 of the regulation can perform limited preventive maintenance.

B. According to Part 43 of the regulation, A pilot is certificated to perform limited preventive maintenance.

C. A certificated pilot is authorized by Part 43 of th e regulation to perform limited preventive maintenance.

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44be-4821-c0b8-ef8d402da900.html
点击查看答案
2019. If you cannot push a needle or equivalent through the inspection hole, then rod eye is deep enough

A. 如果不能将针或校准销推入检查孔,则表示杆眼足够深。

B. 如果不能将针或检查销推入检查孔,则表示杆眼足够深。

C. 如果不能将针或类似物推入检查孔,则表示杆眼足够深。

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44b9-cbd5-c0b8-ef8d402da900.html
点击查看答案
2186. Before you do servicing of the hydraulic system, isolate it

A. 隔离液压系统之前,做勤务。

B. 在勤务液压系统之前,将其隔离。

C. 在增压液压系统之前,先将其隔离。

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bc-265f-c0b8-ef8d402da900.html
点击查看答案
875. 通过次要的汇流条为其他系统,包括发电机、继电器、逆变器、电瓶等产生、控制和提供交流电和/或自流电的电源组件和部件。

A. Those electrical units and components which generate, control and supply AC and/or DC electrical power for other systems, including generators and relays, inverters, batteries, etc., through the secondary busses.

B. Those electrical moudle and components which produce, control and supply AC and/or DC electrical power for other systems, including generators and relays, inverters, batteries, etc., through the secondary busses.

C. Those electrical units and components which generate, control and supply AC and /or DC electrical power for other systems, including generators and solenoid, inverters, cell, etc., through the secondary busses.

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b42-9dc3-c0b8-ef8d402da900.html
点击查看答案
2152. 在尽可能的情况下示例,相关条件和技术的说明应与图表显示在同一页上,如果页面空间放不下必要的信息则应使用面向图表的另一页面

A. It is possible to use the same page to include the examples, associated conditions and technique. Should there be no necessary information included, refer to the page facing the chart.

B. If the same page contains examples, associated conditions and techniques, you need to include all the necessary information, it is forbidden to use the page that the figure faces.

C. Where possible, examples, associated conditions and technique should be presented on the same page as the chart. If space is not enough to include the necessary information, then the page facing the chart should be used.

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bb-b614-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载