APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
2840. Outlets along the side walls and the center of the ceiling divide the air for symmetrical supply

A、 为了供应充足,沿着侧壁和天花板中心的出口将空气分离

B、 为了供应不过量,沿着侧壁和天花板中心的出口将空气分离

C、 为了供应对称均衡,沿着侧壁和天花板中心的出口将空气分离

答案:C

设备系统操作理论翻译
2459. Measure the depth of the dent with a straight edge and feeler gauges
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-b486-c0b8-ef8d402da900.html
点击查看题目
3231. The microprocessor cards are interchangeable
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-b3e4-c0b8-ef8d402da900.html
点击查看题目
1134. 制造商可以省略不适用于其产品的系统
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d2-ddb0-c0b8-ef8d402da900.html
点击查看题目
3277. The purpose of the APU is to generate and supply a single type or combination of auxiliary electric, hydraulic, pneumatic or other power
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e37-4def-c0b8-ef8d402da900.html
点击查看题目
1726. 确保维修插头安装到位
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67e-7ef9-c0b8-ef8d402da900.html
点击查看题目
1490. 谁该干这项工作,这个问题需要考虑。
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d8-0087-c0b8-ef8d402da900.html
点击查看题目
3063. Remove and discard cotter pin and nuts
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e34-ad52-c0b8-ef8d402da900.html
点击查看题目
1529. 为了在预处理空气连接单向阀在打开位置不工作时放行飞机,执行以下步骤。
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67b-fccf-c0b8-ef8d402da900.html
点击查看题目
29. Technical texts often contain long groups of words that have the function of one part of speech in a sentence
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf3-8784-c0b8-ef8d402da900.html
点击查看题目
1754. 经批准的修理部分应包括进行修理所需的工艺和技术。
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67e-d9c4-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

2840. Outlets along the side walls and the center of the ceiling divide the air for symmetrical supply

A、 为了供应充足,沿着侧壁和天花板中心的出口将空气分离

B、 为了供应不过量,沿着侧壁和天花板中心的出口将空气分离

C、 为了供应对称均衡,沿着侧壁和天花板中心的出口将空气分离

答案:C

设备系统操作理论翻译
相关题目
2459. Measure the depth of the dent with a straight edge and feeler gauges

A. 用直尺和塞尺测量划痕的深度。

B. 用直尺和塞尺测量凹痕深度。

C. 用直边的卡尺测量凹坑的深度。

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-b486-c0b8-ef8d402da900.html
点击查看答案
3231. The microprocessor cards are interchangeable

A. 微处理器卡可以更换。

B. 微处理器卡可以互换。

C. 微知理器卡可以改变。

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-b3e4-c0b8-ef8d402da900.html
点击查看答案
1134. 制造商可以省略不适用于其产品的系统

A. Manufacturers may delete systems not applicable to their product.

B. Manufacturers may omit systems not applicable to their product.

C. Manufacturers may submit systems not applicable to their product.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d2-ddb0-c0b8-ef8d402da900.html
点击查看答案
3277. The purpose of the APU is to generate and supply a single type or combination of auxiliary electric, hydraulic, pneumatic or other power

A. The APU is designed to generate and supply one or some of the following power: auxiliary electric, hydraulic, pneumatic or other power.

B. The purpose of the APU is to produce and distribute one or more auxiliary electric, hydraulic, pneumatic or other power.

C. Auxiliary electric, hydraulic, pneumatic or other power can be generated and supplied by one or several APUs.

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e37-4def-c0b8-ef8d402da900.html
点击查看答案
1726. 确保维修插头安装到位

A. Ensure the repair plug fits

B. Ensure the fix plug fits

C. Ensure the repair rivets fits

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67e-7ef9-c0b8-ef8d402da900.html
点击查看答案
1490. 谁该干这项工作,这个问题需要考虑。

A. The question whom should do the work requires consideration.

B. The question who should do the work requires consideration.

C. The question how should do the work requires consideration

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d8-0087-c0b8-ef8d402da900.html
点击查看答案
3063. Remove and discard cotter pin and nuts

A. 拆除并丢弃开口销和螺帽

B. 拆除并丢弃开口销和螺栓

C. 拆除并报废开口销和螺丝

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e34-ad52-c0b8-ef8d402da900.html
点击查看答案
1529. 为了在预处理空气连接单向阀在打开位置不工作时放行飞机,执行以下步骤。

A. For release with the ground preconditioned air connection single valve inoperative in the open position, do these steps.

B. For dispatch with the ground preconditioned air connection check valve inoperative in the open position, do these steps.

C. For release with the ground recondition ed air connection check valve inoperative in the open position, do these steps.

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67b-fccf-c0b8-ef8d402da900.html
点击查看答案
29. Technical texts often contain long groups of words that have the function of one part of speech in a sentence

A. 技术文本常常包含很长的词组,这些词组在一个句子中具有一个个词性的功能。

B. 技术文件常常由很长的词汇构成,这些词在句子中的词性只有一种。

C. 技术文件常常包括长词组,在同一句子中这些词的功能是一种词性。

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf3-8784-c0b8-ef8d402da900.html
点击查看答案
1754. 经批准的修理部分应包括进行修理所需的工艺和技术。

A. The approved repair part must contain the skill and technology required to carry up the repair.

B. The approved repair portion shall include processes and techniques necessary for performing a repair.

C. The necessary workmanship and skills constitute the approval of the repair portion.

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67e-d9c4-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载