APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
2863. 对机身的下部做外部检查

A、 Do external inspection for the lower fuselage.

B、 Check the exterior of the lower fuselage.

C、 Inspect the exterior of the lowest fuselage.

答案:A

设备系统操作理论翻译
1033. Ground service bus has no power with external power available
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d1-93b2-c0b8-ef8d402da900.html
点击查看题目
2454. Complex sentence structure and the large number of meanings and synonyms that many English words have can cause confusion
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-a47b-c0b8-ef8d402da900.html
点击查看题目
846. 整个这件事我记得很清楚,就仿佛是昨天发生似的。
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b42-456f-c0b8-ef8d402da900.html
点击查看题目
399. 确保液压油不会穿透插座。
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf8-4ffa-c0b8-ef8d402da900.html
点击查看题目
3238. If the error is more than 3 deg, calibrate the compass
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-ca2a-c0b8-ef8d402da900.html
点击查看题目
2238. Install a spacer between the two washers
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bc-c77a-c0b8-ef8d402da900.html
点击查看题目
3159. 一个控制杆控制活门的位置。
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-d813-c0b8-ef8d402da900.html
点击查看题目
641. 让粘合剂变硬。
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b3f-be46-c0b8-ef8d402da900.html
点击查看题目
1464. Fill the space between the patch and the adjacent structure with sealant
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d7-b0e5-c0b8-ef8d402da900.html
点击查看题目
579. Wire the cable to the structure
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b3e-c9b5-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

2863. 对机身的下部做外部检查

A、 Do external inspection for the lower fuselage.

B、 Check the exterior of the lower fuselage.

C、 Inspect the exterior of the lowest fuselage.

答案:A

设备系统操作理论翻译
相关题目
1033. Ground service bus has no power with external power available

A. Ground service bus has no power, but the external power can be supplied.

B. Ground service bus is not energized with external power.

C. Ground service bus is power off when external power is supplied.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d1-93b2-c0b8-ef8d402da900.html
点击查看答案
2454. Complex sentence structure and the large number of meanings and synonyms that many English words have can cause confusion

A. 英语单词复杂的句子结构以及多个含义和缩写词会对读者造成混淆。

B. 复杂的句子结构多个含义和术语以及多个英语单词会对读者造成混淆。

C. 复杂的句子结构以及英语单词的多重含义和同义词会对读者造成混淆。

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-a47b-c0b8-ef8d402da900.html
点击查看答案
846. 整个这件事我记得很清楚,就仿佛是昨天发生似的。

A. I remember the whole thing for it happened yesterday.

B. I remember the whole thing as if it happened yesterday.

C. I remember the whole thing similar it happened yesterday.

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b42-456f-c0b8-ef8d402da900.html
点击查看答案
399. 确保液压油不会穿透插座。

A. Make sure that hydraulic fluid does not bypass plugs.

B. Make sure that the hydraulic fluid does not pierce receptacles.

C. Make certain hydraulic fluid does not penetrate receptacles.

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf8-4ffa-c0b8-ef8d402da900.html
点击查看答案
3238. If the error is more than 3 deg, calibrate the compass

A. 如果错差超过3度,则要改装指南针。

B. 如果误差超过3度,则要校准罗盘。

C. 如果角度超过3度,则要调整圆规。

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-ca2a-c0b8-ef8d402da900.html
点击查看答案
2238. Install a spacer between the two washers

A. 安装一个间隔装置在两个垫圈之间

B. 安装一个垫圈在两个垫片之间

C. 安装一个垫片在两个垫圈之间

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bc-c77a-c0b8-ef8d402da900.html
点击查看答案
3159. 一个控制杆控制活门的位置。

A. A lever controls the valve position.

B. A lever controls the valve open and close.

C. A stick rotates the valve position.

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-d813-c0b8-ef8d402da900.html
点击查看答案
641. 让粘合剂变硬。

A. Let the substance become hard.

B. Let the adhesive become hard.

C. Let the admixture become hard.

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b3f-be46-c0b8-ef8d402da900.html
点击查看答案
1464. Fill the space between the patch and the adjacent structure with sealant

A. 用密封剂填充补片及相邻结构之间的缝隙。

B. 用密封剂填充补片的缝隙,并粘接相邻结构。

C. 在附近的密封结构和补片之间留出空隙。

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d7-b0e5-c0b8-ef8d402da900.html
点击查看答案
579. Wire the cable to the structure

A. Attach the cable to the structurewith wire;

B. Make the wire and cable parallel to the structure;

C. Connect the wire of the cable to the structure;

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b3e-c9b5-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载