APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
3067. Refer to detail C on fig4 for a different procedure to attach the cable

A、 根据图4C,了解连接导线的不同程序。

B、 请参阅图4上的细节C,了解连管路的程序。

C、 请参阅图4上的细节C,了解连接导线的不同程序。

答案:C

设备系统操作理论翻译
3076. If this maneuver cannot be performed safely, a warning against attempting it shall be provided
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e34-d533-c0b8-ef8d402da900.html
点击查看题目
765. 厨房地板上方的水分可以通过地板表面的小洞渗入,肉眼是看不到的。
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b41-4689-c0b8-ef8d402da900.html
点击查看题目
1629. 除非对系统的理解很有必要,否则不需要显示回流管。
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67d-475d-c0b8-ef8d402da900.html
点击查看题目
297. 大多数军用和商用飞机使用涡扇发动机
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf7-0d8a-c0b8-ef8d402da900.html
点击查看题目
1366. Those electrical cables, conduits, plugs, sockets, etc, which serve several power plant systems, but which are banded together to facilitate removal and installation of the power plant Does not include the wiring which is specifically covered under another system
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d6-1c70-c0b8-ef8d402da900.html
点击查看题目
2854. A hole of several inches in diameter may be cut in a piece of metal at a point where the metal is not needed for strength, and the edges of the hole are flanged to give it rigidity
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d2-ce88-c0b8-ef8d402da900.html
点击查看题目
2461. Do the procedure that follows
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-ba92-c0b8-ef8d402da900.html
点击查看题目
278. ABC has determined that providing additional inspection requirements is prerequisite to further ensure that the airplanes can continue to carry the design loads it was originally certified for based on inspections, tests, and analyses because of the varied mission the airplanes performed, type of care given, and age and utilization rates
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf6-cea4-c0b8-ef8d402da900.html
点击查看题目
2866. 带有磁性的工具对罗盘系统有不利影响。
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d2-f535-c0b8-ef8d402da900.html
点击查看题目
73. 英语的复杂句子结构和大量的涵义及同义词会让读者混淆
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-179d-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

3067. Refer to detail C on fig4 for a different procedure to attach the cable

A、 根据图4C,了解连接导线的不同程序。

B、 请参阅图4上的细节C,了解连管路的程序。

C、 请参阅图4上的细节C,了解连接导线的不同程序。

答案:C

设备系统操作理论翻译
相关题目
3076. If this maneuver cannot be performed safely, a warning against attempting it shall be provided

A. 如果不能安全执行此地面移动操作,警告不要再次尝试它。

B. 如果不能安全执行此操作,应提供警告不要再次尝试此操作。

C. 如果不能安全执行此操作,应提供警告不要尝试此操作。

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e34-d533-c0b8-ef8d402da900.html
点击查看答案
765. 厨房地板上方的水分可以通过地板表面的小洞渗入,肉眼是看不到的。

A. Water above the kitchen floor can seep in through small holes in the floor surface, invisible to the naked eye.

B. Eyes cannot see the vapor which may penetrate through small holes of the floor surface in the galley.

C. Moisture above the galley floor can go through small holes in the floor surface area and stay out of view

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b41-4689-c0b8-ef8d402da900.html
点击查看答案
1629. 除非对系统的理解很有必要,否则不需要显示回流管。

A. Return lines need not be shown in entirety unless necessary to the understanding of the system.

B. An understanding of the system is necessary for the return line to be displayed in its entirety.

C. The return line does not need to be shown in its entirety unless an understanding of the entire system is required.

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67d-475d-c0b8-ef8d402da900.html
点击查看答案
297. 大多数军用和商用飞机使用涡扇发动机

A. Most military and commercial aircraft is equipped with turbo-fan engines

B. Most freighter and commercial aircraft is equipped with propeller engine

C. Most freighter and commercial aircraft is equipped with turbo-fan engines

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf7-0d8a-c0b8-ef8d402da900.html
点击查看答案
1366. Those electrical cables, conduits, plugs, sockets, etc, which serve several power plant systems, but which are banded together to facilitate removal and installation of the power plant Does not include the wiring which is specifically covered under another system

A. 给多个用电系统服务的电缆、导管、插头、插座等,并且这些电缆、导管、插头、插座是捆绑在一起的,以便于拆卸和安装。不包括在另一个系统中特别涵盖的导线。

B. 给多个用电系统服务的电缆、导管、插头、插座等,但这些电缆、导管、插头、插座是捆绑在一起的,以便于拆卸和安装。不包括在另一个系统中特别涵盖的导线。

C. 给多个用电系统服务的电缆、导管、插头、插座等,但这些电缆、导管、插头、插座是捆绑在一起的,以便于拆卸和安装。还包括在另一个系统中特别涵盖的导线。

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d6-1c70-c0b8-ef8d402da900.html
点击查看答案
2854. A hole of several inches in diameter may be cut in a piece of metal at a point where the metal is not needed for strength, and the edges of the hole are flanged to give it rigidity

A. 在一块不需要承力的金属上,可以在某一点处切割一个直径为几英寸的孔,孔的周围用法兰连接,使其具有刚度

B. 在一块金属上,可以在不需要承力的某一点处切割一个直径为数英寸的孔,孔的边缘折边可以使其具有刚性

C. 在一块不需要承力的金属上,可以在一处切割几个直径为数英寸的孔,孔的边缘用凸缘连接,使其产生刚性

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d2-ce88-c0b8-ef8d402da900.html
点击查看答案
2461. Do the procedure that follows

A. 执行所有的程序。

B. 执行以下程序。

C. 执行以上程序。

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-ba92-c0b8-ef8d402da900.html
点击查看答案
278. ABC has determined that providing additional inspection requirements is prerequisite to further ensure that the airplanes can continue to carry the design loads it was originally certified for based on inspections, tests, and analyses because of the varied mission the airplanes performed, type of care given, and age and utilization rates

A. ABC has determined the varied mission the airplanes performed, type of care given,and age and utilization rates because providing additional inspection requirements is prerequisite to further ensure that the airplanes can continue to carry the design loads it was originally certified for based on inspections, tests, and analyses.

B. Because of the varied mission the airplanes performed, type of care given, and age and utilization rates, ABC has determined, based on inspections, tests, and analyses, that it is prerequisite to provide additional inspection requirements to further ensure that the airplanes can continue to carry the design loads it was originally certified for.

C. To further ensure that the airplanes can continue to carry the design loads it was originally certified for.owing to the diversified mission the airplanes performed, type of care given,and age and utilization rates, ABC has determined that providing additional inspection requirements is necessary based on inspections, tests, and analyses.

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf6-cea4-c0b8-ef8d402da900.html
点击查看答案
2866. 带有磁性的工具对罗盘系统有不利影响。

A. Magnetic tools have an adverse effect in the compass system.

B. Magnetic tools have an unwanted effect on the compass system.

C. Magnetic tools affect the compass system.

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d2-f535-c0b8-ef8d402da900.html
点击查看答案
73. 英语的复杂句子结构和大量的涵义及同义词会让读者混淆

A. complex sentence structure and the large number of meanings and antonym that many English words have can cause confusion

B. complex sentence structure and the large number of meanings and synonyms that many English words have can cause confusion

C. complex sentence structure and the large number of meanings and diverse that many English words have can cause confusion

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-179d-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载