APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
3100. The fasteners must align with the holes in the track

A、 快速定点必须与航迹的点吻合。

B、 夹具必须贴合导轨上的洞。

C、 紧固件必须和滑轨内的孔对准。

答案:C

设备系统操作理论翻译
413. 让部件的温度下降直到其与周围的温度一致。
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf8-7ac4-c0b8-ef8d402da900.html
点击查看题目
410. The localizer course is aligned with the centerline of the runway, and the glideslope path is at a constant angle to the threshold of the runway
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf8-71ee-c0b8-ef8d402da900.html
点击查看题目
1649. The circuit breakers are installed on the rear of the unit
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67d-863f-c0b8-ef8d402da900.html
点击查看题目
260. 许多读者的英语知识有限,复杂的句子结构和许多英语单词所具有的大量的意义和同义词会引起混淆。
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf6-9290-c0b8-ef8d402da900.html
点击查看题目
1532. The minimum time between checks is two minutes
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67c-066e-c0b8-ef8d402da900.html
点击查看题目
2250. 对系统进行渗漏测试。
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bc-ecce-c0b8-ef8d402da900.html
点击查看题目
369. 电磁活门应在图表中显示,并包含一条注释说明活门是由弹簧加载在开位还是关位。
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf7-f342-c0b8-ef8d402da900.html
点击查看题目
431. Do these two steps simultaneously
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf8-b356-c0b8-ef8d402da900.html
点击查看题目
2099. Continuing Airworthiness Program Inspections usually consist of two pages one text page and one illustration page
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44ba-d38e-c0b8-ef8d402da900.html
点击查看题目
1298. Identify sections that can cause specific types of trouble
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-493f-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

3100. The fasteners must align with the holes in the track

A、 快速定点必须与航迹的点吻合。

B、 夹具必须贴合导轨上的洞。

C、 紧固件必须和滑轨内的孔对准。

答案:C

设备系统操作理论翻译
相关题目
413. 让部件的温度下降直到其与周围的温度一致。

A. Let the temperature of the component increase until it is the same as the ambient temperature.

B. Let the temperature of he component decrease until it is the same as the ambient temperature.

C. Let the temperature of the compound decrease until it is the same as the ambient temperature.

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf8-7ac4-c0b8-ef8d402da900.html
点击查看答案
410. The localizer course is aligned with the centerline of the runway, and the glideslope path is at a constant angle to the threshold of the runway

A. 定位器与跑道中心线对齐,下滑道与跑到出口成一定角度。

B. 航道与跑道中心线对齐,下滑道与跑到入口成恒定角度。

C. 航道与跑道中心线对齐,下滑道与跑到出口成恒定角度。

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf8-71ee-c0b8-ef8d402da900.html
点击查看答案
1649. The circuit breakers are installed on the rear of the unit

A. 跳开关安装在组件的前部。

B. 跳开关位于组件侧面。

C. 跳开关安装在组件的后部。

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67d-863f-c0b8-ef8d402da900.html
点击查看答案
260. 许多读者的英语知识有限,复杂的句子结构和许多英语单词所具有的大量的意义和同义词会引起混淆。

A. Many readers have little knowledge of English. Complex sentence structure and the large number of meanings and antonyms that many English words have can cause misconception.

B. Many readers have a limited knowledge of English. Complex sentence structure and the large number of meanings and synonyms that many English words have can cause confusion.

C. Many readers have a little knowledge of English. Complex sentence structure and the large number of meanings and homonyms that many English words have can cause frustration.

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf6-9290-c0b8-ef8d402da900.html
点击查看答案
1532. The minimum time between checks is two minutes

A. 两次检查后最少等待两分钟。

B. 两次检查之间的最短时间是两分钟。

C. 两次检查之间最多等待两分钟。

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67c-066e-c0b8-ef8d402da900.html
点击查看答案
2250. 对系统进行渗漏测试。

A. Do the leak test of the system.

B. Test the system for leaks.

C. Find the leaks of the sytem.

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bc-ecce-c0b8-ef8d402da900.html
点击查看答案
369. 电磁活门应在图表中显示,并包含一条注释说明活门是由弹簧加载在开位还是关位。

A. See the graphics for information of the solenoid valves which shall contain a note indicating the position of the valve(weather spring-loaded to its open or closed position).

B. Solenoid valves indicated on the schematic shall have a notation indicating when the valve shall be spring-loaded to the open or dosed position.

C. Solenoid valves shall be indicated on the schematic and shall include a notation indicating whether the valve is spring-loaded to the open or dosed position.

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf7-f342-c0b8-ef8d402da900.html
点击查看答案
431. Do these two steps simultaneously

A. Do these two steps at the same time;

B. Do these two steps step by step;

C. Do these two steps one after another;

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf8-b356-c0b8-ef8d402da900.html
点击查看答案
2099. Continuing Airworthiness Program Inspections usually consist of two pages one text page and one illustration page

A. 持续权威程序测试通常由两页组成一个文本页和一个图解页

B. 持续适航工作检查总是包含两页:一个文本页和一个描述页

C. 持续适航程序检查通常包括两页,一个文本页和一个图解页

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44ba-d38e-c0b8-ef8d402da900.html
点击查看答案
1298. Identify sections that can cause specific types of trouble

A. 确认可能导致麻烦的具体类别

B. 确定可能导致特定类型故障的部分

C. 剔除可能导致特定类型故障的部分

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-493f-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载