A、 This program describes how to identify an immediate failure and how to handle a malfunction occurred.
B、 This procedure explains how to recognize impending problems and what to do if malfunctions occur.
C、 How to confirm the current problems and what should you do when malfunctions occur are described in this procedure.
答案:B
A、 This program describes how to identify an immediate failure and how to handle a malfunction occurred.
B、 This procedure explains how to recognize impending problems and what to do if malfunctions occur.
C、 How to confirm the current problems and what should you do when malfunctions occur are described in this procedure.
答案:B
A. 不管使用哪种方法,任何符合GAMA格式的出版物都将使用相同的基础数字系统。
B. 不管使用哪种方法,任何执行GAMA格式的出版物都将使用相同的基本编号系统。
C. 无论使用哪种方法,任何符合GAMA格式的出版物都将使用相同的基本编号系统。
A. 组装总管
B. 安装连料
C. 安装总管
A. OTHER
B. OTHERWISE
C. ORIGINAL
A. The values doesn't have to be more than the approved differences.
B. The values must be less than the approved differences.
C. The values must not be less than the approved differences.
A. This system still works after test.
B. Test shows no faults in this system.
C. This system is inoperative before test.
A. 这个手册需要花费两个小时读完。
B. 做这个程序需要两个小时。
C. 两个小时必须完成这个程序。
A. 制造商可制定查询CAP时的程序,并为发现的不适航的情况(无论是否包含在CAP中)提供建议(来自遵循CAP的营运人和维修厂)
B. 制造商可制定程序,对遵循CAP时发现的不适航的情况(无论是否包含在CAP中)提供反馈(来自遵循CAP的营运人和维修厂)
C. 制造商可制定程序,对补充CAP时发现的不适航的情况(无论是否包含在CAP中)提供方案(来自遵循CAP的营运人和维修厂)
A. Entrance stairs or step are connected with entrance doors and move accordingly.
B. Entrance stairs or step are integrated with entrance doors and operate together.
C. Although entrance stairs or step operate together with entrance doors,they are not integrated.
A. 上述所需材料应按照顺序来提供。
B. 上述所需材料应按如下方式提供。
C. 上述要求的物质应如下所示。
A. 在选择检查时间和应力腐蚀的影响时,并未考虑腐蚀的影响。 确定腐蚀的影响非常困难,但是,由于收到了CAP检查报告,因此将针对任何严重问题调整检查时间。
B. 在选择检查时间或对疲劳应力的影响时,并未考虑腐蚀的影响。 确定腐蚀的严重程度非常困难,但是,由于收到了CAP检查报告,因此将针对任何严重问题调整检查时间。
C. 在选择检查时间或对疲劳应力的影响时,并未考虑腐蚀的影响。 确定腐蚀的影响非常困难,但是,由于收到了CAP检查报告,因此将针对任何严重问题调整检查时间。