APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
3175. The time between clicks must be 20 seconds

A、 每间隔20秒点击次。

B、 咔哒声的时间间隔必须为20秒。

C、 必须将咔哒声的时间间隔调整为20秒。

答案:B

设备系统操作理论翻译
1728. 润滑垫圈的一侧。
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67e-8561-c0b8-ef8d402da900.html
点击查看题目
990. 这个原理图的使用者是飞行员
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b44-26d1-c0b8-ef8d402da900.html
点击查看题目
2217. Do not make a recess of more than 5 mm for the studs
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bc-8590-c0b8-ef8d402da900.html
点击查看题目
2871. FLUSH THE FILTER WITH HOT WATER
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-069a-c0b8-ef8d402da900.html
点击查看题目
3158. Use a solution of soap and water to check that there are no air leaks at the pressurization tube connections between the air pressure filter assembly near the pneumatic crossover manifold duct in the left/right bays and the air charging valve manifold assembly in the right main landing gear wheel well
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-d4b7-c0b8-ef8d402da900.html
点击查看题目
3143. The CAP inspection sets forth manufacturer recommended retirement times for parts or assemblies( ) and FAA required retirement ( ) times for life limited parts or assemblies
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-a34b-c0b8-ef8d402da900.html
点击查看题目
2183. The static discharger is electrically bonded to the frame
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bc-1d2f-c0b8-ef8d402da900.html
点击查看题目
3311. 有些仪器是单片机结构的集成部件,具备完整的电路功能。
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e37-b933-c0b8-ef8d402da900.html
点击查看题目
131. Connect the towing arm to the nose gear
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-cd69-c0b8-ef8d402da900.html
点击查看题目
202. 确保工作区域有足够的空气流通。
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-aeb9-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

3175. The time between clicks must be 20 seconds

A、 每间隔20秒点击次。

B、 咔哒声的时间间隔必须为20秒。

C、 必须将咔哒声的时间间隔调整为20秒。

答案:B

设备系统操作理论翻译
相关题目
1728. 润滑垫圈的一侧。

A. Lubricate one side of the washers.

B. Lubricate one side of the seals.

C. Wash one side of the washers.

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67e-8561-c0b8-ef8d402da900.html
点击查看答案
990. 这个原理图的使用者是飞行员

A. The user of this schematic diagram is the mechanic

B. The user of this schematic diagram is the pilot

C. The user of this schematic diagram is the flight attendant

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b44-26d1-c0b8-ef8d402da900.html
点击查看答案
2217. Do not make a recess of more than 5 mm for the studs

A. 螺柱的凹陷不得超过5mm

B. 螺柱的突起不得超过5mm

C. 螺纹的长度不得超过5mm

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bc-8590-c0b8-ef8d402da900.html
点击查看答案
2871. FLUSH THE FILTER WITH HOT WATER

A. RINSE FILTTER IN HOT RUUNING WATER.

B. FLASH THE FILTER WITH HOT WATER.

C. FLESH THE HOT WATER WITH FILTER.

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-069a-c0b8-ef8d402da900.html
点击查看答案
3158. Use a solution of soap and water to check that there are no air leaks at the pressurization tube connections between the air pressure filter assembly near the pneumatic crossover manifold duct in the left/right bays and the air charging valve manifold assembly in the right main landing gear wheel well

A. 使用肥皂和水溶液检查左/右舱气动交叉歧管导管附近的空气压力过滤器组件和右主起落架轮舱充气阀总管组件之间的增压管接头处没有漏气。

B. 使用肥皂和水的解决方案检查左/右舱气动交叉歧管导管附近的空气压力过滤器组件和右主起落架轮舱充气阀歧管组件之间的减压管接头处没有漏气。

C. 使用肥皂和水的解决方案检查左/右舱气动交换歧管导管附近的空气压力过滤器组件和右主起落架轮舱充气阀软管组件之间的增压管接头处没有释压。

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-d4b7-c0b8-ef8d402da900.html
点击查看答案
3143. The CAP inspection sets forth manufacturer recommended retirement times for parts or assemblies( ) and FAA required retirement ( ) times for life limited parts or assemblies

A. CAP检查列出制造商建议的零件或组件的报废时间(使用小时数、循环或其他适当的决定因素)和FAA要求的关于时寿零件或组件的报废(维护拆换)时间。

B. CAP检查设定四家推荐的制造商的零件或组件退役时问(使用时间周期或其他适当的计算方法)和FAA要求的时间限制零组件的退役(维护拆换)时间。

C. CAP检查包在建议的厂家零部件退役时间(使用时间周期或其他合适的计量因子)和FAA要求的零部件退役(不服役)时间后进行。

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-a34b-c0b8-ef8d402da900.html
点击查看答案
2183. The static discharger is electrically bonded to the frame

A. 静电放电装置被安装在隔框上。

B. 搭铁线装置被焊接在隔框上。

C. 静电放电装置被焊接在隔框上。

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bc-1d2f-c0b8-ef8d402da900.html
点击查看答案
3311. 有些仪器是单片机结构的集成部件,具备完整的电路功能。

A. Some equipment are integrated into a monolithic structure which has the full circuit features.

B. Some devices are integrated circuit with monolithic structure which can operate independently.

C. Some devices have integrated components, in monolithic structure, which perform complete circuit Functions.

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e37-b933-c0b8-ef8d402da900.html
点击查看答案
131. Connect the towing arm to the nose gear

A. Hinge the towing arm up to the nose gear.

B. Hook the towing arm up to the nose gear.

C. Fix the towing arm tip to the nose gear.

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-cd69-c0b8-ef8d402da900.html
点击查看答案
202. 确保工作区域有足够的空气流通。

A. Make sure that there is supplied air flow in the work area.

B. Make sure that there is sufficient airflow in the work area.

C. Make sure that there is efficient airflow in the work area.

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-aeb9-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载