A、 Do the weighing procedure in this sequence.
B、 In this order to perform the swapping procedure.
C、 In this sequence to do the analysis procedure.
答案:A
A、 Do the weighing procedure in this sequence.
B、 In this order to perform the swapping procedure.
C、 In this sequence to do the analysis procedure.
答案:A
A. When the airplane, engine and component manufacturers prepare Continuing Airworthiness Program Inspection Documents(which may also be called Continuing Airworthiness Programs or CAPs),they can consult this Specification as a guidance.
B. General Aviation Manufacturers Association Built up this Specification to guide the airplane, engine and component manufacturers to prepare Continuing Airworthiness Program Inspection Documents(which may also be called Continuing Airworthiness Programs or CAPs). All types of general aviation airplanes and components certified under the applicable Federal Aviation Regulations may be utilized to CAPs
C. General Aviation Manufacturers Association Built up this Specification to guide the airplane, engine and component manufacturers to prepare Continuing Airworthiness Program Inspection Documents(which may also be called Continuing Airworthiness Programs or CAPs). All types of general aviation airplanes and components certified under the applicable Federal Aviation Regulations may prepare CAPs
A. LOCK
B. JOINT
C. LINK
A. 泵安装在3号翼肋,紧挨着前翼梁。
B. 泵安装在3号翼肋,位于前翼梁的后部。
C. 泵安装在3号翼粱,位于后翼肋的前面。
A. The operation of new generation aircraft has adopted the operation method of damage tolerance.
B. The damage tolerance design method is applicable to the new type aircraft.
C. The design concept of damage tolerance was successfully applied to the design of new generation aircraft.
A. In order to do the engine bleed system leak check use APU to pressurize the system and check if there are leaks in the sensing tube and these system components.
B. The leak inspection of the engine bleed air system describes how to use APU to pressurize the system to inspect whether the sense lines and the system parts leak or not.
C. The way to check the leakage of the senses pipes and the system components by compressing system using APU is described.
A. Use the specified one if the equivalent material is not available.
B. Use the available equivalent one if no material is specified.
C. If you can not get the specified material, use an equivalent.
A. You need to use lens assembly and retainer as tooling to removed the filter.
B. Galley ventilation filters can be replaced by mechanic in the line maintenance.
C. Galley ventilation filters can not be replaced by mechanic in the line maintenance.
A. You can calibrate all the compass systems at the same time.
B. You can fix all the compass systems at the same time.
C. You can calibrate all the magnetic needle systems at the same time.
A. The manufacturer couldn't decide the information to be included on the cover.
B. The information to be included on the cover will be decided by the manufacturer.
C. The information is included on the left side of the cover by the manufacturer.
A. The description could be pronounced in the active voice
B. Descriptive content can be written in active voice
C. You should read it in voice as you write the descriptive text