7.An architect is designing the expansion of an existing vSphere 7 environment. The customer is requesting a design for a new cluster to support the anticipated future business growth. The requirements specified for the existing environment design must be considered when designing the new cluster.
The existing design has the following requirements:
REQ01 The environment has an availability target of 99.5% for all infrastructure.
REQ02 The recovery time objective ( ) for Tier 1 virtual machines is one hour.
REQ03 Windows and Linux virtual machines must reside on separate clusters.
REQ04 Access to the management cluster within the environment must be controlled.
Which of the listed requirements would be classified as a functional requirement?
A. The environment has an availability target of 99.5% for all infrastructure
B. The recovery time objective (RTO) for Tier 1 virtual machines is one hour
C. Access to the management cluster within the environment must be controlled
D. Windows and Linux virtual machines must reside on separate clusters
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-bff0-c0f9-29e3bb5dbe01.html
查看题目
17.As part of a new hybrid cloud initiative for a large financial company, the customer technical team is presenting an overview of the current state of the infrastructure and their vision for a new solution.
The project team captures notes during the presentation and adds them to the discovery documentation.
Which of the listed statements is a design constraint?
A. The applications are created in-house with in-guest recovery protection
B. The maximum tolerable data loss is 10 minutes
C. The two data center locations have a network latency of 8 ms round-trip time (RTT)
D. The existing storage is out of maintenance
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-fa88-c0f9-29e3bb5dbe00.html
查看题目
54.Following a recent acquisition, the architect learns that both companies use vSphere on-premise and will need to combine the data centers into one. The acquired company's licenses will not be renewed for costsavings related to the acquisition. All consumed vSphere licenses must have active support to support lineof-business operations. The merged environment must maintain 25% spare capacity. The architect has asmall budget remaining unallocated for hardwarE、
The architect has calculated that the current vSphere environment can absorb the acquired company's virtual machines but the cluster will run at 90% memory utilization and at 50% CPU utilization.
Which design decision can the architect make to incorporate the new company's virtual machines into the combined vSphere environment?
A. Migrate the acquired company's virtual machines into the vSphere environment as it will currently fit.
B. Use the current budget to add memory to the cluster to increase each ESXi host's capacity and add the new virtual machines.
C. Purchase extra hosts to add to the cluster in anticipation of adding the acquired company's virtual machines.
D. Purchase new licenses for some of the acquired company's ESXi hosts and add them to the cluster to hold the acquired company's virtual machines.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-9ab0-c0f9-29e3bb5dbe00.html
查看题目
67.A Cloud Service Provider wants to introduce backup as a service for a customer’s vSphere-based virtual machines.
The following information is noted:
They have a single four-port (2 × 10 GbE and 2 × 1 GbE) NIC per ESXi host.
All top-of-rack (ToR) switches are 10 GbE and fully populated.
The backup traffic must not impact existing services .
Which two recommendations should the architect make to help the customer incorporate the service?Choose two.
A. Enable and tag traffic on the backup distributed port group
B. Add a new two-port 10 GbE NIC per ESXi host
C. Replace the existing NIC with a two-port 25 GbE NIC per ESXi host
D. Match the Class of Service (CoS) and Differentiated Services Code Point (DSCP) values to the physical network
E. Create a new virtual switch using the 1 GbE uplinks
G.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-e100-c0f9-29e3bb5dbe00.html
查看题目
32.A customer requests a review of its current vSphere platform design.
The following information is noted:
There are three different workload profiles for the virtual machines:
- Tier-1 virtual machines operate resource-intensive applications and require dedicated allocations for CPU and RAM.
- Tier-2 virtual machines operate internet-facing applications and require access to externally facing networks.
- Tier-3 virtual machines operate platform management tools such as vCenter Server and have different lifecycle management requirements.
Tier-1, Tier-2 and Tier-3 virtual machines are all hosted on a single large vSphere cluster.
The Chief Information Security Officer ( ) has raised concerns that hosting externally facing applications alongside management tools does not meet internal compliance standards.
The Operations team has raised concerns about Tier-1 virtual machines negatively impacting the performance of vCenter Server.
The Operations lead has stated that management changes have consistently been rejected by application teams.
A. Separate Tier-1, Tier-2 and Tier-3 virtual machines using dedicated distributed virtual switches (DVS)
B. Separate Tier-2 virtual machines onto a dedicated cluster
C. Separate Tier-1, Tier-2 and Tier-3 virtual machines onto dedicated clusters
D. Separate Tier-1, Tier-2 and Tier-3 virtual machines using resource pools and shares
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-40d8-c0f9-29e3bb5dbe01.html
查看题目
83.An architect is designing a new vSphere cluster. The requirement is to provide a total of 96 CPU cores and 1.5 TB RAM across all hosts.
The following information has been provided:
Two different physical hardware profiles are available for the ESXi hosts in the cluster.
- Profile 1: 16 CPU cores and 256 GB RAM
- Profile 2: 32 CPU cores and 512 GB RAM
Profile 2 is twice as expensive to purchase as Profile 1.
Which two aspects should the architect consider when selecting the hardware profile? Choose two.
A. The manufacturer and model of the CPUs in the hosts
B. The amount of capacity available for failover of virtual machines within the cluster
C. The downtime allowed for virtual machines that will be running within the cluster
D. The cost to procure and maintain the hardware
E. The number of virtual machines that will be running within the cluster
https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-2f20-c0f9-29e3bb5dbe00.html
查看题目
20.Following a company merger, there are two data centers running vSphere environments. Both data centers are leveraging separate Layer 3 vMotion networks.
Which requirement must be met in order to enable vMotion migration between these locations?
A. The vMotion service must be configured on the Management VMkernel adapter
B. A dedicated TCP/IP stack for vMotion with a dedicated gateway must be configured
C. A stretched vMotion network must be configured between data centers
D. Virtual machines must be powered off in order to migrate them between data centers
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-0258-c0f9-29e3bb5dbe00.html
查看题目
27.The Chief Operating Officer ( ) at an organization raises concerns that their virtual infrastructure environment is vulnerable. Recently, a security-related issue with a virtual machine caused all management services to become unavailable. No budget is available in the short term for additional platform investment.
A. The virtual infrastructure environment must connect application virtual machines and management services to new physical network switches
B. The virtual infrastructure environment must connect application virtual machines and management services to separate distributed virtual switches (DVS)
C. The virtual infrastructure environment must connect application virtual machines and management services to separate VLANs
D. The virtual infrastructure environment must connect management services to a vSphere standard switch (VSS)
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-2580-c0f9-29e3bb5dbe00.html
查看题目
44.A architect is designing a new VMware software-designed data center ( ) using vSphere 7 to meet the following requirements:
The SDDC must be deployed at two locations: primary and secondary.
vSphere Replication must be used to replicate virtual machines between the two locations.
Site Recovery Manager must be used to orchestrate disaster recovery ( ) activities.
One single-sign on ( ) domain must be used to authenticate access at both locations.
Which design decision should the architect make to meet these requirements?
A. A vCenter Server Appliance will be deployed to each site. Unique SSO domains will be created per site.
B. A vCenter Server will be installed on Windows virtual machines deployed to both sites.
C. A vCenter Server Appliance will be deployed to each site.
D. A vCenter Server Appliance will be deployed to the primary site only.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-6fb8-c0f9-29e3bb5dbe00.html
查看题目
2.An architect is finalizing the design for a new vCenter Server High Availability deployment.
What is one thing the architect must document in the design?
A. The load balancing algorithm used by the Management Distributed Virtual Switches (DVS)
B. The SSH configuration settings for the vCenter Server’s active node
C. The vCenter Management Network IPv4 addresses for the witness node vCenter Server
D. The details of each of the vCenter Server licenses for active, passive and witness nodes
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-ac68-c0f9-29e3bb5dbe00.html